Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670992

- Product Categories
- Friendly Links
- home > Supply > 3.0-type diamond pipe jacking machine, water pipe jacking machine, water injection pipe jacking machine
3.0-type diamond pipe jacking machine, water pipe jacking machine, water injection pipe jacking machine
Information Name: | 3.0-type diamond pipe jacking machine, water pipe jacking machine, water injection pipe jacking machine |
Published: | 2015-03-16 |
Validity: | 360 |
Specifications: | 3.0 Type |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | HBXJS-G-3.0 / 5.5-type diamond pipe jacking machine technical parameters: Item Unit Parameter Value Host Host speed r / min ≥145 Weight kg 15/30 ratio of 1:10 motor Model Y132S-4 / Y10019-4 rated power Kw 3.0 / 5.5 V 380 Rated voltage Rated current A 6.8 / 11 rated speed r / min 1400 noise load dB (A) ≤55 / 70 walking motor rated speed r / min 1400 Kw 0.37 Rated Power Rated current Rated voltage V 380 A 1.12 1:59 output speed ratio r / min 24 Spindle speed r / min ≥2.5 other performance load pushing speed mm / min ≥500 drilling speed mm / min ≥500 hole diameter mm ≥350 / 450 m length of the largest drilling ≥40 / 50 Instructions: 1. Before using the rig to check the line is connected, whether or cable scratch leakage phenomenon, whether pipe connected securely, whether there is loosening. 2. Do anhydrous reaming, must be done after the first water drilling, drill down to stop after the first approach. 3. When you first add Φ70 drill construction, open positive start switch, with manual or automatic mode while the drill pipe jacking open water switch, without water after the first stop after the drill completely into using calipers stuck drill pipe open at the same time anti-start switch Back hosts connected root drill pipe, drill pipe with a positive way to start jacking can be securely connected again, so the cycle operation. 4. backreaming drilling should be based on soil conditions, pore size, adjust back expansion speed. 5. In order to facilitate the construction and installation of the pros and cons of the start switch, solved the slow manual lever when changing operational problems. 6. generally higher than normal water volume required when drilling straight pullback reaming and properly adjust the pump flow can reduce the amount of sludge pipeline memory. Notes: 1. The crew must wear insulated shoes, and are familiar with the machine operating methods and general performance of the structure of the safety issues... 2. Before using the machine, the motor must be installed into the line side leakage protection device. 3. Before using the cable must check whether the damage is scratched. 4. Before using the machine, check the parts screws are loose, if loose must be tightened in order to use. 5. Never dry drilling, strict implementation of the first water, after drilling, drilling the first stop, after the shutdown method. 6. Use pre-drill must be sharp. 7. grafting must drill with fixed calipers at the connecting rod stuck then change. Careful observation of changes in the work (except reverse change lever) 8. When switching clubs, confirm drill without loosening the slider, drill off phenomenon. 9. prohibit the use of the following occurs: a: a leak occurs hemp hand b: within the host does not sound normal, if bump hitting sound, etc. c: motor sound is not normal, such as screaming, etc. 10. Do not disassemble this occurred at the construction site machine. Maintenance and Repair: 1. Check the air operation of the machine without abnormal sound or smell (reducer or motor inside). 2. Always check the wear of the seal ring to avoid water from entering the gearbox or motor inside. 3. Replace badly worn bearings and gears, cleaning up the oil, replace the oil, motor oil are not allowed. 4. When disassembling the motor, using a rubber mallet or hammer as well. 5. stator overhaul should do load short circuit. And pressure experiments, and to ensure the recovery of the original performance of the machine. 6. rig after use, you need to wipe dust, oil and other dirt, check the screw. Nut fastening. 7. After cleaning up, the machine should be properly kept in a dry place to prevent rusting parts, motor damp. 8. identify problems and timely treatment or replacement parts must be used. Walking motor diagram supplied with the host structure diagram (send) Accessories: Name Type Quantity Remarks drill Φ40x1m 30 ROOT pump station pipe Φ26x5 1 m a turn ring set 1 set drill reamer Φ70 1 个 Φ180 1 个 Φ260 1 a Φ350 1 个 reamer Φ180 1 个 Φ260 1 个 Φ350 1 个 Φ450 1 个 |
Admin>>>
You are the 5170 visitor
Copyright © GuangDong ICP No. 10089450, Bazhou East Trenchless Equipment Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5170 visitor
Copyright © GuangDong ICP No. 10089450, Bazhou East Trenchless Equipment Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility